03
Apr
Transaction
Country:Maldives
Product:Sound Attenuator
1. Customer’s payment bill before production.
2. Customer’s payment bill after production.
Production
1. Provide customers with drawings and produce according to the drawings.
2. The Sound Attenuator are in production.
3. The Sound Attenuator... read more
06
Mar
Transaction
1. Customer’s deposit payment bill before production.
Production
1. Testing unit operation.
Production
2. Ready to ship.
Production
3. In shipping warehouse.
read more
21
Mar
Transaction
Country: New Zealand
Product Name: Centrifugal Fan
Customerhas pay the deposit and now is confirm the rotation and ready to start production.
Production
1.The production has been finished the cutting process.
2. Three sets of Stainless Steel centrifugal... read more
06
Jul
Transaction
Country:Bolivia
Product:DX AHU
1. Customer’s payment bill before production.
read more
03
Aug
Transaction
Country:Thailand
Product:centrifugal fan
1.Customer is payment bill before production.
Production
1. The factory has completed the cutting of the fan.
2. The factory has completed the welding of the fan.
3. The factory has completed the shaping of the... read more
20
Nov
Transaction
1. Customer’s payment bill before production.
Production
1. Provide customers with drawings and produce according to the drawings.
2. The Centrifugal fan are in production.
3. The housing and motor of the fan have been assembled by our workers.
4.... read more
01
Feb
Transaction
1. T/T 30% to be paid as deposit.
Production
1. Ingredients arrive at factory.
2. Unit assembly.
3. Unit test.
Transportion
1. Shipment.
read more
17
Oct
Contraction
Country Name: Indonesia
Product Name: Centrifugal Fan and Other Accessories
read more
29
Apr
1.25th Apr.2020-Guatemala-Hand-Held Thermal Fogging Machine-Receive the customer’s bank receipt.
2.The goods have been produced and packed. It has been sent to Qingdao Port.
3.The product has been sent by sea, the date of launch is 2020-05-22, the original bill of lading has been sent.
read more
17
Jul
Country:Indonesia
Tracking number:2021041701
1.This is the AHU used in the plastic processing plant in Indonesia. We discussed for more than three months and reached an agreement
2.16th,July 2021. AHU-Received customer’s back receipt.
3.At present, the customized AHU unit is being assembled. It is expected to take about 2-3 days. After the assembly is completed, we will conduct a test and issue a test report.
read more