1.20th October.2020-Tunisia-FogCannon-Received customer’s back receipt.
2.Products have been tested before leaving the factory, and have been packaged and shipped.
3. 13th January.2021-Tunisia-Fog Cannon-Received customer’s balance.
1.20th October.2020-Tunisia-FogCannon-Received customer’s back receipt.
2.Products have been tested before leaving the factory, and have been packaged and shipped.
3. 13th January.2021-Tunisia-Fog Cannon-Received customer’s balance.
Transaction 1. Received customer’s bank slip. Production 1. Production progress update . 2. Hopper production has been completed. 2. Waiting to install air bag and pulse valve . read more
Transaction 1. Received customer’s purchase order. Production 1. Production progress update:Impeller. 2. Production progress update: Ready to ship. 3. As we have stock, the goods are been tested again before delivery. read more
Country:HongKong Product:Blower for glue room Drawing 1.31th Dec.2020 Received customer’s purchase order. 2.Production progress update:Impeller 3.Production progress update: Impeller balance testing 4.Production progress update: Ready to ship Transaction-Second Order Country:HongKong Product:Explosion Portable Fan CTF-300 2.As we have stock, the goods are been tested again before delivery. read more
Transaction Country:Vietnam Product:mining fan 1. T/T 30% to be paid as deposit. Production 1. The factory has completed the cutting of the fan blades. 2. The fan has been molded. 3. Motor arrival at the factory, processing assembly stage. read more
Country: Peru Product name: Impeller 2.The impeller has been produced and tested for dynamic balance, and it was sent out via FedEx last Saturday 3.The goods have been sent to Peru and are undergoing customs clearance. The customer will receive the goods within 3 days read more
Transaction 1. Customer payment in full. Production 1. The Coil production is completed. 2. The dimensions are being measured according to the drawing. read more
Transaction 1. T/T(USD655.00) as deposit (Paid). Production 1. The centrifugal fan is tested. 2. The Centrifugal fan production is completed. 3. The product is packed and The dimensions of the wooden cases were measured. read more
1.11th Feb.2020–Received the payment–Peru–Fog Cannon. 2.Production Completed. 3.Shipping and Package Disinfection. read more
Received the payment–Thailand–Industrial Fan. read more
Transaction 1. My deposit receipt from the client. Production 1. Explosion-proof dust collector testing. 2. Explosion-proof dust collector accessories packaging completed. 3. The dust collector has been tested and is now complete. Transportion 1. The explosion-proof... read more