1.20th October.2020-Tunisia-FogCannon-Received customer’s back receipt.
2.Products have been tested before leaving the factory, and have been packaged and shipped.
3. 13th January.2021-Tunisia-Fog Cannon-Received customer’s balance.
1.20th October.2020-Tunisia-FogCannon-Received customer’s back receipt.
2.Products have been tested before leaving the factory, and have been packaged and shipped.
3. 13th January.2021-Tunisia-Fog Cannon-Received customer’s balance.
Transaction 1. (USD13700.00)as deposit (Paid). Production 1. Theproduction is completed. 2. Theproduction has been tested. read more
Transaction Customer’s payment bill before production. 2. Customer’s payment bill after production. Production 1. Provide customers with drawings and produce according to the drawings. 2.The Centrifugal fan are in production. 3.The Centrifugal fan are assembled by our workers. 4.Centrifugal fan pictures to... read more
Country:Indonesia Tracking number:2021041701 1.This is the AHU used in the plastic processing plant in Indonesia. We discussed for more than three months and reached an agreement 2.16th,July 2021. AHU-Received customer’s back receipt. 3.At present, the customized AHU unit is being assembled. It is expected to take about 2-3 days. After the assembly is completed, we will conduct a test and issue a test report. read more
1.22th May.2020-Chile-Fogging Machine-After receiving the payment voucher, the customer pays the renminbi in China through a Chinese friend. 2.26th May.2020-Chile-Fogging Machine-One sample is sent by UPS express first. read more
Transaction Country:Mongolia Product:Axial Fan 1. 50% Deposit payments in advance from customer. Production 1. The fan casing has been completely welded. 2. The purchased Siemens Bader motor has arrived at the factory. 3. The factory has completed the welding work.... read more
1.1st July. 2020062601-USA-Electrostatic sprayer(red)-Customer Pay by Credit card 2.Tested before leaving the factory and ready for transportation to USA. 3.Transportation info read more
Transaction Country:Mexico Product Name:Airfoil impeller 23th Jan.2021 Received customer’s purchase order. Production 2.Wheel processing. 3.Blade size modification, sample confirmation. 4.Production progress update:Blade assembly welding. ... read more
Transaction 1. T/T(USD655.00) as deposit (Paid). Production 1. The centrifugal fan is tested. 2. The Centrifugal fan production is completed. 3. The product is packed and The dimensions of the wooden cases were measured. read more
Transaction Country:Vietnam Product:mining fan 1. T/T 30% to be paid as deposit. Production 1. The factory has completed the cutting of the fan blades. 2. The fan has been molded. 3. Motor arrival at the factory, processing assembly stage. read more