1.26th August.2020-Saudi Arabia-Fog Cannon-Received customer’s back receipt.
2.Next we will update the production
3.Products have been tested before leaving the factory, and have been packaged and shipped.
1.26th August.2020-Saudi Arabia-Fog Cannon-Received customer’s back receipt.
2.Next we will update the production
3.Products have been tested before leaving the factory, and have been packaged and shipped.
Transaction Country:Panama City Product:Laundry Heat Pump 1. Received PO. 2. Customer pays the final payment. Production 1. Assembly of Heat Pumps in Production. 2. Heat Pump is Being Prepared for Testing. Transportation 1. Preparing for Transportation. 2.... read more
Contraction Country Name: Indonesia Product Name: Centrifugal Fan and Other Accessories read more
Transaction Country:Thailand Product:Vacuum Pump 1. 50% Deposit payments in advance from customer. Production 1. The factory molds the goods into shape. 2. Factory completed polishing and painting. 3. The factory has completed the inspection of the fan. Transportation ... read more
Country: Peru Product name: Impeller 2.The impeller has been produced and tested for dynamic balance, and it was sent out via FedEx last Saturday 3.The goods have been sent to Peru and are undergoing customs clearance. The customer will receive the goods within 3 days read more
Transaction 1. Received 50% deposit from customer. Production 1. Raw material has been cut, and next will be welded. 2. The impeller has been finished,and meet the dynamic balance test. 3. The welding of the fan is complete. 5. The assembly of the fan is complete. 6. The inspection and trial run have been completed. Transportion ... read more
Transaction 1. My deposit receipt from the client. Production 2. Packing and weighing artificial plants. read more
Transaction 1. Received customer’s bank slip. Production 1. Production progress update . 2. Hopper production has been completed. 2. Waiting to install air bag and pulse valve . read more
Transaction 1. T/T 30%. 2. The balance payment has been made, and we are waiting for shipment. Production 1. Drilling in progress for the cooling coils. 2. Pressure testing underway for the cooling coils. 3. Plate material has arrived at the factory. 4. The filter and The cooling has arrived at the factory. 5. The fan has arrived at the factory. 6. Assembly of air handling units. 7. Assembly of air handling units and Sealing of panels.... read more
Order date: 2020.11.03 Country: Slovenia Product name: Fluororubber Diaphragm 1.We received the payment from the Slovenian customer 2.The goods have been sorted out and ready for transportation read more
1.12th May.2020-Peru-30m Spray Cannon-Receive the customer’s bank receipt. 2.The goods are in production. 3.Horizontal centrifugal pump has been scheduled to arrive, wait for the motor to arrive for installation. 4.28th May.2020-Peru-30m Spray Cannon-The product has finished production 5.The goods are packed and ready to ship read more