20
Nov
Transaction
Customer’s payment bill before production.
2. Customer’s payment bill after production.
Production
1. Provide customers with drawings and produce according to the drawings.
2.The Centrifugal fan are in production.
3.The Centrifugal fan are assembled by our workers.
4.Centrifugal fan pictures to... read more
29
May
Transaction
Country:Thailand
Product:Dust collector
1. T/T 50% to be paid as deposit.
Production
1. Upper box production.
2. The box is welded.
3. Dust collector box.
4. Mounting brackets.
5. Painting and wiring have been completed.
6.... read more
03
Apr
Transaction
Country:Maldives
Product:Sound Attenuator
1. Customer’s payment bill before production.
2. Customer’s payment bill after production.
Production
1. Provide customers with drawings and produce according to the drawings.
2. The Sound Attenuator are in production.
3. The Sound Attenuator... read more
13
May
1.13th May. 2020-El Salvador-Double Drum Bag Dust Collector and Negative Pressure Fan-Receive the customer’s bank receipt.
2.Next, we will update the packing and delivery of the goods.
read more
29
Feb
1.11th Feb.2020–Received the payment–Peru–Fog Cannon.
2.Production Completed.
3.Shipping and Package Disinfection.
read more
21
Mar
Transaction
Country: New Zealand
Product Name: Centrifugal Fan
Customerhas pay the deposit and now is confirm the rotation and ready to start production.
Production
1.The production has been finished the cutting process.
2. Three sets of Stainless Steel centrifugal... read more
18
Oct
Constraction
CountryName: Indonesia
Products Name: Cutting Blower
50% Deposit payments in advance from customer
read more
10
Apr
Transaction
Country:Mexico
Product Name:Airfoil impeller
23th Jan.2021 Received customer’s purchase order.
Production
2.Wheel processing.
3.Blade size modification, sample confirmation.
4.Production progress update:Blade assembly welding.
... read more
20
Dec
1.PVC Flexible Air Duct and Axial Flow Fan has been finished.
2.Air Ducts and Axial Fans have been shipped to the port, and it takes about a week to ship.
read more
30
Nov
1.Received a deposit from a Filipino customer— Refrigeration Unit.
2.Parts of the refrigeration unit are in place and ready to be assembled.
3.The refrigeration unit has finished. We will test refrigeration unit on next Monday, and shoot the test video.
4.Refrigeration unit has completed the first... read more