1.1st July. 2020062601-USA-Electrostatic sprayer(red)-Customer Pay by Credit card
2.Tested before leaving the factory and ready for transportation to USA.
3.Transportation info
1.1st July. 2020062601-USA-Electrostatic sprayer(red)-Customer Pay by Credit card
2.Tested before leaving the factory and ready for transportation to USA.
3.Transportation info
Transaction 1. Received 50% deposit from customer. Production 1. Raw material has been cut, and next will be welded. 2. The impeller has been finished,and meet the dynamic balance test. 3. The welding of the fan is complete. 5. The assembly of the fan is complete. 6. The inspection and trial run have been completed. Transportion ... read more
1.On November 14, 2019, Honduran customer purchased a Roots blower and paid 50% deposit by T/T. 2.The Roots Blower has been finished production. 3.Roots Blower has completed preliminary testing and sends test videos and reports to customers. read more
Transaction Country: Turkey Product name: Fog cannon 1. Receive customer deposit 2. Production read more
1.16th Apr.2020-Thailand-Mist Cannon-We received the Purchase Order from this customer. 2.26th Apr.2020-The goods are packed and shipped. After the customer received the product, he placed a new order. 1.21th May.2020-Thailand-Mist Cannon-We received the Purchase Order from this customer. 2.26th May.2020-Thailand-Mist Cannon-Receive the customer’s bank receipt. read more
1.Receive payment slips from customers. read more
2019-04-14:Cargo is ready and waiting for painting. Waiting for the balance payment. read more
Transaction Country: Philippines Product:Boiler Fan 1.50% Deposit payments in advance from the customer. 2. The housing has been finished by robot welding with the common base. 3. The boiler fan has been sprayed with anti-rust primer. 4. The industrial centrifugal fan... read more
Transaction Country: Hongkong Product Name: centrifugal fan 10-18-8C 1.Customer’s payment bill before production. Production 1.Provide customers with drawings and produce according to the drawings. 2.Housing, impeller in the production process. 3.The housing and motor of the fan have been... read more
Transaction 1. T/T 100% to be paid as deposit. Production 1. Assembly of functional segments. 2. Production completed. 3. The achine of testis completed. Transportion 1. Packaging completed. 2. The machine has been shipped. read more
Transaction Country:Mexico Product Name:Airfoil impeller 23th Jan.2021 Received customer’s purchase order. Production 2.Wheel processing. 3.Blade size modification, sample confirmation. 4.Production progress update:Blade assembly welding. ... read more