06
Mar
Transaction
1. Customer’s deposit payment bill before production.
Production
1. Testing unit operation.
Production
2. Ready to ship.
Production
3. In shipping warehouse.
read more
30
Dec
Transaction
Country: Singapore
Product Name: Air Duct for Tunnel
1.Customer’s deposit payment bill before production.
Production
1.The goods has been finished and ready to ship.
Ready to ship to singapore this tommorrow.
read more
29
Apr
1.24th Apr.2020-Canada-Electrostatic Sprayer-Receive the customer’s bank receipt.
2.Next, we will update the production of the product.
read more
09
Aug
Transaction
Country: Serbia
Product Name: Mining Fan
1.Customer pays 50% deposit.
Production
1.The blanking is completed and the drum welding is completed, fan splicing and assembly were completed.
2. Painting completed.
read more
24
Sep
Transaction
Country:Indonesia
Products Name: Cutting Blower-22Kw
1.We have received the PO from the customer and have notified the production department to prepare a production plan to start production
Production
2.The fan blower has been produced, and the dynamic balance test has been carried out, and the fan blower operation test has been carried out.
3.The fan has been packaged and ready to... read more
16
Mar
Transaction
1. Customer payment in full.
Production
1. The Coil production is completed.
2. The dimensions are being measured according to the drawing.
read more
21
Sep
Transaction
Country: Indonesia
Product: dust collector
1.50% Deposit payments in advance from the customer.
Production
1.Housing has been finished robert welding.
2.Paiting has been done. And ready to test and ship.
read more
11
Apr
Transaction
Country:Panama City
Product:Laundry Heat Pump
1. Received PO.
2. Customer pays the final payment.
Production
1. Assembly of Heat Pumps in Production.
2. Heat Pump is Being Prepared for Testing.
Transportation
1. Preparing for Transportation.
2.... read more
19
Feb
10-Feb.-2020,we received the Guatemalan Customer water bill of centrifugal fan.
Packaging and delivery of Guatemalan fans
read more
02
Jun
1.21th May.2020-Peru-Mist Cannon-Receive the customer’s bank receipt.
2.The product has finished production.
3.03th Jun.2020-BILL OF LADING
read more