1.The product is finished.
2.The original ship scheduled for October 13 will be postponed to the 19th.
Bill of lading number:I240248347S04
Vessel voyage:TIHAMA 011W
1.The product is finished.
2.The original ship scheduled for October 13 will be postponed to the 19th.
Bill of lading number:I240248347S04
Vessel voyage:TIHAMA 011W
Translation 1. Receive the deposit from the customer’s refrigeration unit. Production 1. Receive the deposit from the customer’s refrigeration unit. 2. Parts of the refrigeration unit are in place and ready to be assembled. 3. The initial trial... read more
Transaction Country:Vietnam Product:centrifugal fan and impeller 1. Customer’s payment bill before production. Production 1. Customer’s drawing before production. 2. Have started cutting raw material. Automatic NC cutting. 3. The fan base has been welded by technicians with many years of... read more
Transaction Country:Thailand Product:centrifugal fan 1.Customer is payment bill before production. Production 1. The cutting of the fan has been completed. 2. The molding of the fan has been completed. 3. The external procurement of the fan motor has been... read more
Transaction Country:United Kingdom Product Name:40 Fog Cannon 1.ZiBoDecent Machinery ,Ltd Received deposit from customer today, new order from customer in the UK. order tracking Production 2.Fog cannon test before delivery. Transportation 3.The goods were shipped in mid-June. The workers put the goods into the container in strict... read more
1.13th May.2020-South Africa-Fogging Machine-Receive the customer’s bank receipt. 2.14th May.2020-Production completed. 3.26th May.2020-Ship by sea. read more
Transaction Country: Philippines Product:Boiler Fan 1.50% Deposit payments in advance from the customer. 2. The housing has been finished by robot welding with the common base. 3. The boiler fan has been sprayed with anti-rust primer. 4. The industrial centrifugal fan... read more
1.11th Feb.2020–Received the payment–Peru–Fog Cannon. 2.Production Completed. 3.Shipping and Package Disinfection. read more
Transaction 1. T/T(USD655.00) as deposit (Paid). Production 1. The centrifugal fan is tested. 2. The Centrifugal fan production is completed. 3. The product is packed and The dimensions of the wooden cases were measured. read more
Transaction 1. 50% Deposit payments in advance from the customer. Production 1. CNC cutting and blanking, more precise. Production 2. Fan has been finished as customer’s requirement, the motor on the top is the installation limited. read more