Related Posts
Order Tracking No.:SCY20220100702-U.K-Sound AttenuatorExplosion proof exhaust fan
Transaction Country:U.K. Product:Explosion proof exhaust fan 1. Customer pays for the goods. Production 1. The production of explosion-proof fans is completed and testing is underway. 2. Packed and ready to ship. read more
Order Tracking No.: Ali20230623-Serbia-mining fan
Transaction Country: Serbia Product Name: Mining Fan 1.Customer pays 50% deposit. Production 1.The blanking is completed and the drum welding is completed, fan splicing and assembly were completed. 2. Painting completed. read more
Order Tracking No.:SCY20200827-Mexico-Impeller-Second Order
Transaction Country:Mexico Product Name:Impeller Customer’s payment bill before production. Production 1.Impeller and shaft in production. 2.The impeller is still in production and the shaft has been produced. 3.The blades are spot welded to the hub. ... read more
Order Tracking No.:101080257589-Saudi Arabia-Fog Cannon
1.26th August.2020-Saudi Arabia-Fog Cannon-Received customer’s back receipt. 2.Next we will update the production 3.Products have been tested before leaving the factory, and have been packaged and shipped. read more
Order Tracking No.:2020101201-Afghanistan-Air Cooled Chiller
The Air cooled chiller used in the Afghan pharmaceutical factory has been tested online with customers on March 30, 2021, and is currently ready to be shipped to customers. read more
Order Tracking No.: SCY20230221-Thailand-Dust collector
Transaction Country:Thailand Product:Dust collector 1. T/T 50% to be paid as deposit. Production 1. Upper box production. 2. The box is welded. 3. Dust collector box. 4. Mounting brackets. 5. Painting and wiring have been completed. 6.... read more
Order Tracking No.:SCY20210420-Thailand-Centrifugal Fan Blower FY9-26-16D
Transaction Country:Thailand Product Name:Centrifugal Fan Blower FY9-26-16D 1. 24th May.2021 Received customer’s deposit bank slip. Production 2.The production department has placed orders. Transportation test word read more
Order Tracking No.:2019031101-Philippine-Refrigeration Unit
1.Received a deposit from a Filipino customer— Refrigeration Unit. 2.Parts of the refrigeration unit are in place and ready to be assembled. 3.The refrigeration unit has finished. We will test refrigeration unit on next Monday, and shoot the test video. 4.Refrigeration unit has completed the first... read more
Order Tracking No.:SCY20220714-United Arab Emirates (UAE)-Centrifugal Blower
Transaction Country:United Arab Emirates (UAE) Product:Centrifugal Blower 1.50% Deposit payments in advance from customer. Production 1. The casing, impeller, and bracket parts have been finished lofting,marking-off and cutting. 2. The impeller and casing of the centrifugal fan have been assembled and... read more
Order Tracking No.: Ca2023081201-Panama-Heat Pump
Transaction T/T 100% to be paid as deposit. Production Assembly of functional segments. 2. Production completed. 3. The machine of testis completed. Transportation Packaging completed. 2. The machine has been shipped. read more