1.Product is under production.
2.Product is finished.
Receive customer feedback,very pleasant feeling.
The perfect combination of fog cannon and Tesla.
Customer praise is our greatest motivation.
1.Product is under production.
2.Product is finished.
Receive customer feedback,very pleasant feeling.
The perfect combination of fog cannon and Tesla.
Customer praise is our greatest motivation.
Transaction Country: Saudi Arabia Product: DMC-112 Dust Collector 1.100% payments in advance from the customer. 2. Dust collector body and hopper have all been welded. 3. Color has been painted as per the customer’s requirements. 4. Industrial dust... read more
Received payment for ULV machine from Arab customer,Getting ready for delivery read more
Transaction Transaction Country: Moldova Product Name: Membrane 1. December 7th.2021 Received customer’s bank slip. Production Completed and ready to ship. read more
Transaction Country: Turkey Product name: Fog cannon 1. Receive customer deposit 2. Production read more
1.1st July. 2020062601-USA-Electrostatic sprayer(red)-Customer Pay by Credit card 2.Tested before leaving the factory and ready for transportation to USA. 3.Transportation info read more
Australia -ULV and Mist eliminator 1 1.7th August.2020-Australia-Fogging Machine and ulv-Received customer’s back receipt. 2 2.Products have been tested before leaving the factory, and have been packaged and shipped by air on August 25 read more
Transaction Country:Mexico Product Name:Impeller Customer’s payment bill before production. Production 1.Impeller and shaft in production. 2.The impeller is still in production and the shaft has been produced. 3.The blades are spot welded to the hub. ... read more
Transaction Country: Hongkong, China Product Name: Portable Fan&Duct 1.The customer has ordered the portable fan and duct together. Has made the payment. read more
Transaction Country:Panama City Product:Pool Heat Pump 1. Received PO. 2. Customer pays the final payment. Production 1. Assembly of One-Phase Power Compressor Unit. 2. Assembly of Heat Exchanger. 3. Assembly of Heat Pumps in Production. 4. Almost Finished... read more