09
Apr
Transaction
1. Customer payment in full.
Production
1. The Copper pipe production is completed.
2. The Copper pipe are counted and weighed online.
Transportion
1. Customer payment in full.
read more
30
Aug
1.Production is finished.
2.Production is transported.
read more
02
Jun
1.23th May.2020-Nigeria-Mist Cannon;Fogging Machine;ULV;Electrostatic Sprayer;
Gasoline High Pressure Sterilization Sprayer-Customers pay RMB deposits in China
through Chinese friends.
2.29th May.2020-The customer pays the final renminbi in China through a Chinese friend.
read more
16
Mar
Transaction
1. (USD13700.00)as deposit (Paid).
Production
1. The production is completed.
2. The production has been tested.
3. Video inspection with customer.
read more
19
Sep
Transaction
Country: Australia
Product Name: Dust Fan
1.Customer’sdeposit payment bill before production.
Production
1. The prototype is produced.
2. The following modifications are made:
(1)The wheels are equipped with brakes and the wheel size is increased to ensure smooth operation in poor... read more
02
Jun
1.22th May.2020-Chile-Fogging Machine-After receiving the payment voucher, the customer pays the renminbi in China through a Chinese friend.
2.26th May.2020-Chile-Fogging Machine-One sample is sent by UPS express first.
read more
18
Dec
Transaction
Transaction Country: Moldova
Product Name: Membrane
1. December 7th.2021 Received customer’s bank slip.
Production
Completed and ready to ship.
read more
07
Jan
1.Woodworker dust collector has been installed and completed.
2.Fan Blower has also been completed and tested.
3.Contact the freight forwarder and prepare to ship.
4.The woodworking dust collector has been shipped.
Below are pictures of packing and shipping.
read more
11
Apr
Transaction
Country:Panama City
Product:Pool Heat Pump
1. Received PO.
2. Customer pays the final payment.
Production
1. Assembly of One-Phase Power Compressor Unit.
2. Assembly of Heat Exchanger.
3. Assembly of Heat Pumps in Production.
4. Almost Finished... read more