Transaction
1. T/T 50% as deposit,T/T 50% payment before shipment from factory.
Production
1. Theproduction is completed.
2. The dimensions are being measured according to the drawing.
Transaction Country: Serbia Product Name: Heat Exchanger 1.Customer’sdeposit payment bill before production. Customer’sdeposit payment bill before production. Production 1. The housing has been ready for rust removal and then will assembled with the pipes. 2.Now the heat exchangers has already assembled. ... read more
Australia -ULV and Mist eliminator 1 1.7th August.2020-Australia-Fogging Machine and ulv-Received customer’s back receipt. 2 2.Products have been tested before leaving the factory, and have been packaged and shipped by air on August 25 read more
Transaction Country:Vietnam Product:centrifugal fan 1.Customer’s payment bill before production. Production 1. Provide customers with drawings and produce according to the drawings. 2. Impeller in the production process. 3.Housing during production. 4. Base during production. 5.The housing and motor... read more
Transaction Country Name: Egypt Product Name: Centrifugal Blower 1.100% Deposit payments in advance from the customer. read more
Transaction Country:Turkmenistan Product:Dust collector 1.Customer’s payment bill before production. Production 1. The factory has completed the cutting of the dust collector. 2. The workers have started preparing for assembly. 3. The factory has completed the first phase of assembly. ... read more
Transaction Country:Thailand Product Name:Centrifugal Fan Blower FY9-26-16D 1. 24th May.2021 Received customer’s deposit bank slip. Production 2.The production department has placed orders. Transportation test word read more
Transaction 1. 30% Deposit payments in advance from the customer. Production 1. The fan casing has been completely welded. 2. The fan casing has been completely welded. read more
10-Feb.-2020,we received the Guatemalan Customer water bill of centrifugal fan. Packaging and delivery of Guatemalan fans read more