Transaction
1. (USD13700.00)as deposit (Paid).
Production
1. Theproduction is completed.
2. Theproduction has been tested.
Transaction Country:Thailand Product:Dust collector 1. T/T 50% to be paid as deposit. Production 1. Upper box production. 2. The box is welded. 3. Dust collector box. 4. Mounting brackets. 5. Painting and wiring have been completed. 6.... read more
Transaction Country: Indonesia Product Name: Centrifugal Fan 1. November 10th.2021 Received customer’s bank slip. Production 1.Have been finished assembly. And the shaft and bearing are customerised for our customer. 2.A trial running. 3.Formal lab test before delivery. read more
1.24th Apr.2020-Canada-Electrostatic Sprayer-Receive the customer’s bank receipt. 2.Next, we will update the production of the product. read more
Transaction 1. T/T50% as deposit,TT50% balance should be paid before shipment from factory. read more
1.2th February.2021-Chile-Cannon Body-Received customer’s back receipt. Fog Cannon 2.Products have been tested before leaving the factory, and have been packaged and shipped. mist cannon dust suppression fog cannon packing fog cannon nozzle Transaction-Second Order Country: Chile Product Name: Welding Fume Dust Collector 1.17th June.2021-Received customer’s back receipt. Production 2.Products have been tested before leaving the factory, and will be ready to pack and ship. Transportation 3.Expected to arrive in Chile on 14th August. read more
Transaction Country:Cambodia Product:Fan Coil Unit & Condensate Unit 1. T/T 50% to be paid as deposit. 2.T/T 50% to be paid before shipment from factory. Production 1. In stock, the outdoor unit is being packed. 2. In stock, the indoor... read more
Date:2020-09-19 1.Semi finished product 2.Completed Product Transaction-Second order Products Name: Tunnel fan and VFD Production read more
Transaction Country:Maldives Product:Sound Attenuator 1. Customer’s payment bill before production. 2. Customer’s payment bill after production. Production 1. Provide customers with drawings and produce according to the drawings. 2. The Sound Attenuator are in production. 3. The Sound Attenuator... read more
Contraction Country Name: Indonesia Product Name: Centrifugal Fan and Other Accessories read more
Transaction 1. Customer’s deposit payment slip. Production 1. Product nozzle completed. 2. Product control cabinet completed. 3. Product nameplate completed. 4. Product is finished. Transportion 1. Fog cannon packaged and sent to Singapore. read more