Transaction
1. Customer’s deposit payment slip.
Production
1. Product nozzle completed.
2. Product control cabinet completed.
3. Product nameplate completed.
4. Product is finished.
Transportion
1. Fog cannon packaged and sent to Singapore.
Transaction Country: Azerbaijan Production: Centrifugal fan 1. Customer’s deposit payment bill before production. Production 1.Impeller production completed and dynamic blance test. read more
1.The product is finished. 2.The original ship scheduled for October 13 will be postponed to the 19th. Bill of lading number:I240248347S04 Vessel voyage:TIHAMA 011W read more
Country:Thailand Product:Roots blower Date:2020-09-16 Received customer’s bank receipt. read more
Country:HongKong Product:Blower for glue room Drawing 1.31th Dec.2020 Received customer’s purchase order. 2.Production progress update:Impeller 3.Production progress update: Impeller balance testing 4.Production progress update: Ready to ship Transaction-Second Order Country:HongKong Product:Explosion Portable Fan CTF-300 2.As we have stock, the goods are been tested again before delivery. read more
Transaction Country:United Arab Emirates (UAE) Product:centrifugal fan 1.50% Deposit payments in advance from customer. Production 1. The cutting process has been completed, and we are preparing for the welding. 2. The factory has completed the assembly of the fan.he impeller has... read more
Transaction 1. FogCannon-Received customer’s back receipt. 2. Fog Cannon-Received customer’s balance. Production 1. Products have been tested before leaving the factory, and have been packaged and shipped. read more
Transaction Country: Hongkong, China Product Name: Portable Fan&Duct 1.The customer has ordered the portable fan and duct together. Has made the payment. read more
Transaction 1. Customer’s deposit payment bill before production. Production 1. Testing unit operation. Production 2. Ready to ship. Production 3. In shipping warehouse. read more
Transaction Country: Australia Product Name: Dust Fan 1.Customer’sdeposit payment bill before production. Production 1. The prototype is produced. 2. The following modifications are made: (1)The wheels are equipped with brakes and the wheel size is increased to ensure smooth operation in poor... read more
1.Received a deposit from a Filipino customer— Refrigeration Unit. 2.Parts of the refrigeration unit are in place and ready to be assembled. 3.The refrigeration unit has finished. We will test refrigeration unit on next Monday, and shoot the test video. 4.Refrigeration unit has completed the first... read more