Transaction
Country: Thailand
Product Name: ID FAN for Wooding Working Boiler
Transportation
FROM QINGDAO PORT TO BANGKOK BY SEA
Country: Thailand
Product Name: ID FAN for Wooding Working Boiler
FROM QINGDAO PORT TO BANGKOK BY SEA
1.On November 14, 2019, Honduran customer purchased a Roots blower and paid 50% deposit by T/T. 2.The Roots Blower has been finished production. 3.Roots Blower has completed preliminary testing and sends test videos and reports to customers. read more
1.21th May.2020-Peru-Mist Cannon-Receive the customer’s bank receipt. 2.The product has finished production. 3.03th Jun.2020-BILL OF LADING read more
Transaction Country:Italy Produce Name:Fog Cannon 1.10th June.2021-Italy-Fog Cannon-Received customer’s back receipt. Production 2.The workshop is waiting to arrange production 3.Products have been tested before leaving the factory, and will be ready to pack and ship. Transportation 4.The goods has been sailed.Expected to arrive in Genoa on... read more
Transaction 1. Customer payment in full. Production 1. The Copper pipe production is completed. 2. The Copper pipe are counted and weighed online. Transportion 1. Customer payment in full. read more
Transaction Country: New Zealand Product name: ID fan high-temperature model Customer’s deposit payment bill before production at January 12th,2022. Production 1.Have started cutting raw material. Automatic NC cutting. 2.Thefan has been finished assembly and anti-rust paint has been sprayed. read more
Transaction Country: Hongkong Product Name: centrifugal fan 10-18-8C 1.Customer’s payment bill before production. Production 1.Provide customers with drawings and produce according to the drawings. 2.Housing, impeller in the production process. 3.The housing and motor of the fan have been... read more
Transaction Country:Guatemala Product:Fan Blower for Biomass Steam Boiler 1.Customer’s 100% payment bill before production, full trust. Production 1. Have been finished cutting raw material. 2. The two blowers have been finished shot blasting, the housing has completed the welding process. 3. Two... read more
Australia -ULV and Mist eliminator 1 1.7th August.2020-Australia-Fogging Machine and ulv-Received customer’s back receipt. 2 2.Products have been tested before leaving the factory, and have been packaged and shipped by air on August 25 read more
2019-04-14: The dust collector is ready for delivery. read more