Transaction
Country:Guatemala
Product:Fan Blower for Biomass Steam Boiler
Production
Country:Guatemala
Product:Fan Blower for Biomass Steam Boiler
Transaction Country:Italy Produce Name:Fog Cannon 1.10th June.2021-Italy-Fog Cannon-Received customer’s back receipt. Production 2.The workshop is waiting to arrange production 3.Products have been tested before leaving the factory, and will be ready to pack and ship. Transportation 4.The goods has been sailed.Expected to arrive in Genoa on... read more
Transaction 1.Customer’s payment bill before production, full trust. Production 1. Have been finished cutting raw material. 2. Two blowers have all been painted in gray as customers requirement. 3. Professional Testing in the laboratory before delivery. Transportion... read more
Transaction Country:Austria Product:10m Fog cannon 1.T/T 50%.+50%. 2. Customer pays the final payment. Production 1. Production of fog cannon poles. 2. Fog pile head. 3. Fog cannon host. Transportation 1.Production is complete, packed and ready for shipping.... read more
1.13th May. 2020-El Salvador-Double Drum Bag Dust Collector and Negative Pressure Fan-Receive the customer’s bank receipt. 2.Next, we will update the packing and delivery of the goods. read more
Transaction Country: Philippines Product:Boiler Fan 1.50% Deposit payments in advance from the customer. 2. The housing has been finished by robot welding with the common base. 3. The boiler fan has been sprayed with anti-rust primer. 4. The industrial centrifugal fan... read more
Country:Indonesia Product: Centrifugal fan Heat exchanger Filter bag Filter bag cage Rotary valve Pulse valve Pulse valve controller 1.17th Dec.2020 Received customer’s bank slip 2.Production progress update:Centrifugal fan 3.Production progress update:Heat exchanger 4.Production progress update:Filter bag cage 5.Production progress update:Filter bag 6.Production progress update:Rotary valve 7.Production progress update:Pulse valve 8.Production progress update:Pulse valve controller 9.2019-04-14: Cargo is ready and waiting for... read more
Transaction 1. Deposit payments in advance from the customer. Production 1. Goods in Stock will be sent by express. read more
The Air cooled chiller used in the Afghan pharmaceutical factory has been tested online with customers on March 30, 2021, and is currently ready to be shipped to customers. read more
1.22th May.2020-Chile-Fogging Machine-After receiving the payment voucher, the customer pays the renminbi in China through a Chinese friend. 2.26th May.2020-Chile-Fogging Machine-One sample is sent by UPS express first. read more
1.Product is under production. 2.Product is finished. Receive customer feedback,very pleasant feeling. The perfect combination of fog cannon and Tesla. Customer praise is our greatest motivation. read more