Related Posts
Order Tracking No.:100846473244
2019-04-14:Cargo is ready and waiting for painting. Waiting for the balance payment. read more
Order Tracking No.:SCY20231025-Afghanistan-Cooling-Water Machine
Transaction 1. (USD13700.00)as deposit (Paid). Production 1. Theproduction is completed. 2. Theproduction has been tested. read more
Order Tracking No.: Ca2023081201-Panama-Heat Pump
Transaction T/T 100% to be paid as deposit. Production Assembly of functional segments. 2. Production completed. 3. The machine of testis completed. Transportation Packaging completed. 2. The machine has been shipped. read more
Order Tracking No.:Ar20221002-Austria-10m Fog cannon
Transaction Country:Austria Product:10m Fog cannon 1.T/T 50%.+50%. 2. Customer pays the final payment. Production 1. Production of fog cannon poles. 2. Fog pile head. 3. Fog cannon host. Transportation 1.Production is complete, packed and ready for shipping.... read more
Order Tracking No.:An2022112501-Austria-Heat Pump
Transaction 1. Customer’s deposit payment bill before production. Production 1. Testing unit operation. Production 2. Ready to ship. Production 3. In shipping warehouse. read more
Order Tracking No.: SCY2022092801-Uzbekistan-Centrifugal fan
Transaction Country Name: Uzbekistan Product Name: Centrifugal Fan 1. Customer’s payment bill before production. Production 1. Provide customers with drawings and produce according to the drawings. 2. The Centrifugal fan are in production 3. The Centrifugal fan are assembled by our workers. read more
Order Tracking No.:MIC20190703-United Kingdom-40m Fog Cannon
Transaction Country:United Kingdom Product Name:40 Fog Cannon 1.ZiBoDecent Machinery ,Ltd Received deposit from customer today, new order from customer in the UK. order tracking Production 2.Fog cannon test before delivery. Transportation 3.The goods were shipped in mid-June. The workers put the goods into the container in strict... read more
Order Tracking No.:SCY20220719-Malaysia-Tunnel Fan impeller
Transaction 1. Received 100% deposit from customer. Production 1. The material cutting is complete. 2. The housing assembly is complete. 3. The impeller painting is complete. read more
Order Tracking No.:SCY20190302-Brazil-120M Fog Cannon
1.Product is finished. 2.Product is being transported. https://www.scy-fan.com/wp-content/uploads/sites/69/2019/09/发货视频.mp4 read more