10
Oct
1.The product is finished.
2.The original ship scheduled for October 13 will be postponed to the 19th.
Bill of lading number:I240248347S04
Vessel voyage:TIHAMA 011W
read more
20
Nov
Transaction
1. Customer’s payment bill before production.
Production
1. Provide customers with drawings and produce according to the drawings.
2. The Centrifugal fan are in production.
3. The housing and motor of the fan have been assembled by our workers.
4.... read more
25
Mar
Transaction
1. Received customer’s purchase order.
Production
1. Production progress update:Impeller.
2. Production progress update: Ready to ship.
3. As we have stock, the goods are been tested again before delivery.
read more
21
May
Transaction
Country: Hongkong, China
Product: Centrifugal Fan 4-72-10
Production
1.Customer’sCAD drawing before production.
2.Have started cutting raw material. Automatic NC cutting.
3.Thefan base has been welded by technicians with many years of welder experience.
4. The housingand motor of the fan have been assembled by our workers.
5.The impeller... read more
08
Mar
Transaction
1. T/T(USD655.00) as deposit (Paid).
Production
1. The centrifugal fan is tested.
2. The Centrifugal fan production is completed.
3. The product is packed and The dimensions of the wooden cases were measured.
read more
14
Jul
Transaction
Country:Vietnam
Product:mining fan
1. T/T 30% to be paid as deposit.
Production
1. The factory has completed the cutting of the fan blades.
2. The fan has been molded.
3. Motor arrival at the factory, processing assembly stage.
read more
12
Jul
Transaction
Country:Afghanistan
Product:Air-cooled chiller
1. T/T 30% to be paid as deposit.
read more
12
Mar
Transaction
1. Customer’s deposit payment slip.
Production
1. Product nozzle completed.
2. Product control cabinet completed.
3. Product nameplate completed.
4. Product is finished.
Transportion
1. Fog cannon packaged and sent to Singapore.
read more
17
May
Country:Malaysia
Product:Fog Cannon-DMC-40
1.11th May.2021 Received customer’s bank slip
2.The production department has placed orders.
3.Cannon base and cannon bodyo had finished welding and painting treatment.
4.Production progress update every 3-5 days.
4. Test and product details.
5.Production progress update every 3-5 days.
6.The product has been packaged and sent to Qingdao Port.
7.The... read more
19
Oct
After testing.
read more