Transaction
Country:Mexico
Product Name:Airfoil impeller
- 23th Jan.2021 Received customer’s purchase order.
Production
2.Wheel processing.
3.Blade size modification, sample confirmation.
Transportation
Country:Mexico
Product Name:Airfoil impeller
1.Received a deposit from a Filipino customer— Refrigeration Unit. 2.Parts of the refrigeration unit are in place and ready to be assembled. 3.The refrigeration unit has finished. We will test refrigeration unit on next Monday, and shoot the test video. 4.Refrigeration unit has completed the first... read more
1.The product is finished. 2.The original ship scheduled for October 13 will be postponed to the 19th. Bill of lading number:I240248347S04 Vessel voyage:TIHAMA 011W read more
Country:Kenya Product:Dust collector 25th Feb.2021 Received customer’s bank slip. Production progress update Hopper production has been completed Impeller of fan blower production has been completed The production of the fan blower outlet silencer has been completed The dust collector box has been spliced Waiting to install air bag and pulse valve read more
Transaction 1. FogCannon-Received customer’s back receipt. 2. Fog Cannon-Received customer’s balance. Production 1. Products have been tested before leaving the factory, and have been packaged and shipped. read more
Transaction Country:Bahrain Products Name:Roots Blower 1.On August 17, a customer in Bahrain ordered two 100# Roots blowers from our company. We received payment from the customer and arranged production. Production 2.The Roots blower ordered by a customer in Bahrain is in production ... read more
1.16th June.2021-Algeria-Woodworking Dust Collector-Received customer’s back receipt. 2.The producthas been produced, ready to test electrical appliances such as fans and control cabinets, and ready to ship after passing the test 3.The goods have been produced and packaged, ready to be shipped. And edited the assembly video for the customer, the link... read more
Transaction 1. Received customer’s bank slip Production 1.After confirming drawing, start production for ten sets fans. Have finished cutting material process. 2. This is the goods ten sets of cooling fans after shot blasting. 3. Painting the top... read more
Transaction 1. Customer payment in full. Production 1. The Coil production is completed. 2. The dimensions are being measured according to the drawing. read more
Country:Malaysia Product:Fog Cannon-DMC-40 1.11th May.2021 Received customer’s bank slip 2.The production department has placed orders. 3.Cannon base and cannon bodyo had finished welding and painting treatment. 4.Production progress update every 3-5 days. 4. Test and product details. 5.Production progress update every 3-5 days. 6.The product has been packaged and sent to Qingdao Port. 7.The... read more