1.27th May.2020-South Africa-ULV Fogging Machine-Received customer’s back receipt.
2.Next we will update the production of the goods.
1.27th May.2020-South Africa-ULV Fogging Machine-Received customer’s back receipt.
2.Next we will update the production of the goods.
1.1st July. 2020062601-USA-Electrostatic sprayer(red)-Customer Pay by Credit card 2.Tested before leaving the factory and ready for transportation to USA. 3.Transportation info read more
Transaction 1. T/T50% as deposit,TT50% balance should be paid before shipment from factory. read more
Transaction 1.Customer’sdeposit payment bill before production. Production 1.Fans for Pakistani customers have been produced and tested on site. 2. Fans for Pakistani customers have been produced and tested on site. Transportion 1. And the goods have been... read more
Transaction Country:United Arab Emirates (UAE) Product:centrifugal fan 1.50% Deposit payments in advance from customer. Production 1. The cutting process has been completed, and we are preparing for the welding. 2. The factory has completed the assembly of the fan.he impeller has... read more
1.21th Oct.2019-Receive a deposit-Chad-Low flatbed semi trailer 2.31th Jan.2020-Receipt of payment-Chad-Low flatbed semi trailer 3.Stock up 4.Measure 5.Loading read more
1.16th June.2021-Algeria-Woodworking Dust Collector-Received customer’s back receipt. 2.The producthas been produced, ready to test electrical appliances such as fans and control cabinets, and ready to ship after passing the test 3.The goods have been produced and packaged, ready to be shipped. And edited the assembly video for the customer, the link... read more
1.5th Jun.2020-South Africa-Fogging Machine-Received customer’s back receipt. 2.Products have been tested before leaving the factory, and have been packaged and shipped. read more
Transaction Country: India Product Name: Fog Cannon-DMC-30 1.18th March.2022 Received customer’s bank slip Production 1.The production department has placed orders. 2.Production progress update every 3-5 days. read more
Transaction 1. T/T 50% as deposit,T/T 50% payment before shipment from factory. Production 1. Theproduction is completed. 2. The dimensions are being measured according to the drawing. read more