1.21th May.2020-Peru-Mist Cannon-Receive the customer’s bank receipt.
2.The product has finished production.
3.03th Jun.2020-BILL OF LADING
1.21th May.2020-Peru-Mist Cannon-Receive the customer’s bank receipt.
2.The product has finished production.
3.03th Jun.2020-BILL OF LADING
Transaction Country Name: Uzbekistan Product Name: Centrifugal Fan 1. Customer’s payment bill before production. Production 1. Provide customers with drawings and produce according to the drawings. 2. The Centrifugal fan are in production 3. The Centrifugal fan are assembled by our workers. read more
1.25th Apr.2020-Guatemala-Hand-Held Thermal Fogging Machine-Receive the customer’s bank receipt. 2.The goods have been produced and packed. It has been sent to Qingdao Port. 3.The product has been sent by sea, the date of launch is 2020-05-22, the original bill of lading has been sent. read more
Transaction Country:Turkmenistan Product:Dust collector 1.Customer’s payment bill before production. Production 1. The factory has completed the cutting of the dust collector. 2. The workers have started preparing for assembly. 3. The factory has completed the first phase of assembly. ... read more
Transaction Country: Hongkong, China Product Name: Dust collector-MF9015 1.Customer’s payment bill before production. Production 1.The performance test of the dust collector is completed. read more
Transaction Country: Thailand Product Name: ID FAN for Wooding Working Boiler 1.Customer’sdeposit payment bill before production. Production 1.Have started cutting raw material. Automatic NC cutting. 2.The fan base has been welded by technicians with many years of welder experience. 3.Housing is been welding. 4.Impeller dynamic test been finished.And qualified. 5.The shedding... read more
Transaction 1. T/T 30%. 2. The balance payment has been made, and we are waiting for shipment. Production 1. Drilling in progress for the cooling coils. 2. Pressure testing underway for the cooling coils. 3. Plate material has arrived at the factory. 4. The filter and The cooling has arrived at the factory. 5. The fan has arrived at the factory. 6. Assembly of air handling units. 7. Assembly of air handling units and Sealing of panels.... read more
1.23th May.2020-Nigeria-Mist Cannon;Fogging Machine;ULV;Electrostatic Sprayer; Gasoline High Pressure Sterilization Sprayer-Customers pay RMB deposits in China through Chinese friends. 2.29th May.2020-The customer pays the final renminbi in China through a Chinese friend. read more
Transaction Country:Austria Product:10m Fog cannon 1.T/T 50%.+50%. 2. Customer pays the final payment. Production 1. Production of fog cannon poles. 2. Fog pile head. 3. Fog cannon host. Transportation 1.Production is complete, packed and ready for shipping.... read more
Transaction Country: Malaysia Product Name: Tunnel Ventilation fan 1.Receive full payment from customer. read more