1.24th Apr.2020-Canada-Electrostatic Sprayer-Receive the customer’s bank receipt.
2.Next, we will update the production of the product.
1.24th Apr.2020-Canada-Electrostatic Sprayer-Receive the customer’s bank receipt.
2.Next, we will update the production of the product.
Transaction 1. My deposit receipt from the client. Production 1. Explosion-proof dust collector testing. 2. Explosion-proof dust collector accessories packaging completed. 3. The dust collector has been tested and is now complete. Transportion 1. The explosion-proof... read more
1.12th May.2020-Peru-30m Spray Cannon-Receive the customer’s bank receipt. 2.The goods are in production. 3.Horizontal centrifugal pump has been scheduled to arrive, wait for the motor to arrive for installation. 4.28th May.2020-Peru-30m Spray Cannon-The product has finished production 5.The goods are packed and ready to ship read more
1.16th June.2021-Algeria-Woodworking Dust Collector-Received customer’s back receipt. 2.The producthas been produced, ready to test electrical appliances such as fans and control cabinets, and ready to ship after passing the test 3.The goods have been produced and packaged, ready to be shipped. And edited the assembly video for the customer, the link... read more
Transaction Country: Turkey Product name: Fog cannon 1. Receive customer deposit 2. Production read more
Date:25th September 2020 Country:PK Product:Titanium alloy impeller 1.Received customer’s payment. 2.Next:We will update the production progress of the product read more
Transaction Country: United Arab Emirates (UAE) Product: Shredding Blower 1.50% Deposit payments in advance from the customer. 2. Housing and serrated mouth have been finished. 3. Base has been welded with housing and assembled with the shaft, and the inlet... read more
1.Received a deposit from a Filipino customer— Refrigeration Unit. 2.Parts of the refrigeration unit are in place and ready to be assembled. 3.The refrigeration unit has finished. We will test refrigeration unit on next Monday, and shoot the test video. 4.Refrigeration unit has completed the first... read more
Transaction Country:United Arab Emirates (UAE) Product:Centrifugal Blower 1.50% Deposit payments in advance from customer. Production 1. The casing, impeller, and bracket parts have been finished lofting,marking-off and cutting. 2. The impeller and casing of the centrifugal fan have been assembled and... read more
Transaction Country: Hongkong Product Name: centrifugal fan 10-18-8C 1.Customer’s payment bill before production. Production 1.Provide customers with drawings and produce according to the drawings. 2.Housing, impeller in the production process. 3.The housing and motor of the fan have been... read more
Country:Malaysia Product:Fog Cannon-DMC-40 1.11th May.2021 Received customer’s bank slip 2.The production department has placed orders. 3.Cannon base and cannon bodyo had finished welding and painting treatment. 4.Production progress update every 3-5 days. 4. Test and product details. 5.Production progress update every 3-5 days. 6.The product has been packaged and sent to Qingdao Port. 7.The... read more