10-Feb.-2020,we received the Guatemalan Customer water bill of centrifugal fan.
Packaging and delivery of Guatemalan fans
10-Feb.-2020,we received the Guatemalan Customer water bill of centrifugal fan.
Packaging and delivery of Guatemalan fans
1.16th Apr.2020-Thailand-Mist Cannon-We received the Purchase Order from this customer. 2.26th Apr.2020-The goods are packed and shipped. After the customer received the product, he placed a new order. 1.21th May.2020-Thailand-Mist Cannon-We received the Purchase Order from this customer. 2.26th May.2020-Thailand-Mist Cannon-Receive the customer’s bank receipt. read more
Transaction 1. Received customer’s bank slip Production 1.After confirming drawing, start production for ten sets fans. Have finished cutting material process. 2. This is the goods ten sets of cooling fans after shot blasting. 3. Painting the top... read more
1.Fans for Pakistani customers have been produced and tested on site. Wooden boxes are packed for export at the factory, and the goods have been sent to the port for shipment to Pakistan. read more
1.21th Oct.2019-Receive a deposit-Chad-Low flatbed semi trailer 2.31th Jan.2020-Receipt of payment-Chad-Low flatbed semi trailer 3.Stock up 4.Measure 5.Loading read more
Transaction country: Mexico Product: Fog cannon read more
Transaction 1. Received 50% deposit from customer. Production 1. The material cutting is complete. 2. The housing assembly is complete. 3. The fan painting is complete. read more
1.On November 14, 2019, Honduran customer purchased a Roots blower and paid 50% deposit by T/T. 2.The Roots Blower has been finished production. 3.Roots Blower has completed preliminary testing and sends test videos and reports to customers. read more
Transaction 1. T/T 100% to be paid as deposit. Production 1. Assembly of functional segments. 2. Production completed. 3. The achine of testis completed. Transportion 1. Packaging completed. 2. The machine has been shipped. read more
2019-04-13: Cargo delivered already 2019-04-13:standby at the seaport ,waiting for shipping on board read more
1.13th May. 2020-El Salvador-Double Drum Bag Dust Collector and Negative Pressure Fan-Receive the customer’s bank receipt. 2.Next, we will update the packing and delivery of the goods. read more