1.The product—Fog Cannon has finished.
2.Shipment:Scheduled for the 23rd of November, the ship is 10-12 days.
1.The product—Fog Cannon has finished.
2.Shipment:Scheduled for the 23rd of November, the ship is 10-12 days.
1.12th May.2020-Peru-30m Spray Cannon-Receive the customer’s bank receipt. 2.The goods are in production. 3.Horizontal centrifugal pump has been scheduled to arrive, wait for the motor to arrive for installation. 4.28th May.2020-Peru-30m Spray Cannon-The product has finished production 5.The goods are packed and ready to ship read more
Transaction Country:Panama City Product:Laundry Heat Pump 1. Received PO. 2. Customer pays the final payment. Production 1. Assembly of Heat Pumps in Production. 2. Heat Pump is Being Prepared for Testing. Transportation 1. Preparing for Transportation. 2.... read more
Transaction 1. T/T 30%. 2. The balance payment has been made, and we are waiting for shipment. Production 1. Drilling in progress for the cooling coils. 2. Pressure testing underway for the cooling coils. 3. Plate material has arrived at the factory. 4. The filter and The cooling has arrived at the factory. 5. The fan has arrived at the factory. 6. Assembly of air handling units. 7. Assembly of air handling units and Sealing of panels.... read more
Transaction Country:United Kingdom Product Name:40 Fog Cannon 1.ZiBoDecent Machinery ,Ltd Received deposit from customer today, new order from customer in the UK. order tracking Production 2.Fog cannon test before delivery. Transportation 3.The goods were shipped in mid-June. The workers put the goods into the container in strict... read more
1.30th Mar.2020-Bank receipt-Full payment 2.24th Apr.2020-Dust Collector-Bhutan-The products are packed and lead sealed and shipped. read more
Transaction 1. 30% Deposit payments in advance from the customer. Production 1. The fan casing has been completely welded. 2. The fan casing has been completely welded. read more
Transaction Country:Vietnam Product:centrifugal fan 1.Customer’s payment bill before production. Production 1. Provide customers with drawings and produce according to the drawings. 2. Impeller in the production process. 3.Housing during production. 4. Base during production. 5.The housing and motor... read more
Transaction Country:Italy Produce Name:Fog Cannon 1.10th June.2021-Italy-Fog Cannon-Received customer’s back receipt. Production 2.The workshop is waiting to arrange production 3.Products have been tested before leaving the factory, and will be ready to pack and ship. Transportation 4.The goods has been sailed.Expected to arrive in Genoa on... read more
Transaction Country:Thailand Product:centrifugal fan 1.Customer is payment bill before production. Production 1. The factory has completed the cutting of the fan. 2. The factory has completed the welding of the fan. 3. The factory has completed the shaping of the... read more
1.Product is under production. 2.Product is finished. Receive customer feedback,very pleasant feeling. The perfect combination of fog cannon and Tesla. Customer praise is our greatest motivation. read more