Order Tracking

Order Tracking No.:SCY20211211-Serbia-Heat Exchanger

 Transaction Country: Serbia Product  Name: Heat Exchanger 1.Customer’sdeposit payment bill before production. Customer’sdeposit payment bill before production.  Production 1. The housing has been ready for rust removal and then will assembled with the pipes. 2.Now the heat exchangers has already assembled. 3.More pictures sharing. 4.It’s ready to make a gas-filled pressure test, then will assemble the housing, finally to painting. 5.The pressure test has been completed. The [...]

Order Tracking No.:SCY20210326-Pakistan-Centrifugal Fan 9-19-8D

Transaction  Country: Pakistan Product Name: centrifugal fan 9-19-8D  Production 1.Customer’sCAD drawing before production. 2.Have started cutting raw material. Automatic NC cutting. 3.The fan base has been welded by technicians with many years of welder experience. 4. The housingand motor of the fan have been assembled by our workers. 5. The impeller is undergoing a dynamic balance test.  6. The induced draft fan has been finished and ready to [...]

Order Tracking No.:SCY20211119-Thailand-ID FAN for Wooding Working Boiler

 Transaction Country: Thailand Product Name: ID FAN for Wooding Working Boiler 1.Customer’sdeposit payment bill before production. Production   1.Have started cutting raw material. Automatic NC cutting. 2.The fan base has been welded by technicians with many years of welder experience. 3.Housing is been welding. 4.Impeller dynamic test been finished.And qualified. 5.The shedding and assembly have been finished, and the Anti-rust paint process been finished. Then will be painted surface gray color. 6. The induced draft fan has been finished and ready to ship. [...]

Order Tracking No.:SCY20211029-Guatemala-Fan Blower for Biomass Steam Boiler

 Transaction Country:Guatemala Product:Fan Blower for Biomass Steam Boiler 1.Customer’s 100% payment bill before production, full trust.  Production 1. Have been finished cutting raw material. 2. The two blowers have been finished shot blasting, the housing has completed the welding process. 3. Two blowers have all been painted in gray as customers requirement. 4. Professional Testing in the laboratory before delivery. 5. The goods have been sent to port and ready to ship. Waiting for the [...]