Related Posts
02
4月
Order Tracking No.:QCSV-B1911212CT-Chad-Low Flatbed Semi Trailer
1.21th Oct.2019-Receive a deposit-Chad-Low flatbed semi trailer 2.31th Jan.2020-Receipt of payment-Chad-Low flatbed semi trailer 3.Stock up 4.Measure 5.Loading 查看详情
28
9月
Order Tracking No.:20190802-Centrifugal Fan
1.Product is finished. 2.Product is transported. 查看详情
10
10月
Order Tracking No.:SCY2019032001
1.The product is finished. 2.The original ship scheduled for October 13 will be postponed to the 19th. Bill of lading number:I240248347S04 Vessel voyage:TIHAMA 011W 查看详情
29
2月
Order Tracking No.:101019621131-Pure-Fog Cannon
1.11th Feb.2020–Received the payment–Peru–Fog Cannon. 2.Production Completed. 3.Shipping and Package Disinfection. 查看详情
25
3月
(English) Order Tracking No.:SCY20220519-Singapore-Blower for glue room Drawing
对不起,此内容只适用于美式英文。 查看详情
15
11月
(English) Order Tracking No.: Ru2023081501-Tanzania-DX Air Handling Unit
对不起,此内容只适用于美式英文。 查看详情
07
9月
Order Tracking No.:SCY20190302-Brazil-120M Fog Cannon
1.Product is finished. 2.Product is being transported. https://www.scy-fan.com/wp-content/uploads/sites/69/2019/09/发货视频.mp4 查看详情