1.17th June.2020-Peru-Fog Cannon-Received customer’s back receipt.
2.Products have been tested before leaving the factory, and have been packaged and shipped.
1.17th June.2020-Peru-Fog Cannon-Received customer’s back receipt.
2.Products have been tested before leaving the factory, and have been packaged and shipped.
1.12th May.2020-Peru-30m Spray Cannon-Receive the customer’s bank receipt. 2.The goods are in production. 3.Horizontal centrifugal pump has been scheduled to arrive, wait for the motor to arrive for installation. 4.28th May.2020-Peru-30m Spray Cannon-The product has finished production 5.The goods are packed and ready to ship 查看详情
对不起,此内容只适用于美式英文。 查看详情
1.The product is finished. 2.The original ship scheduled for October 13 will be postponed to the 19th. Bill of lading number:I240248347S04 Vessel voyage:TIHAMA 011W 查看详情
1.5th Jun.2020-South Africa-Fogging Machine-Received customer’s back receipt. 2.Products have been tested before leaving the factory, and have been packaged and shipped. 查看详情