1.21th Oct.2019-Receive a deposit-Chad-Low flatbed semi trailer
2.31th Jan.2020-Receipt of payment-Chad-Low flatbed semi trailer
3.Stock up
4.Measure
5.Loading
1.21th Oct.2019-Receive a deposit-Chad-Low flatbed semi trailer
2.31th Jan.2020-Receipt of payment-Chad-Low flatbed semi trailer
3.Stock up
4.Measure
5.Loading
2019-04-14:Cargo is ready and waiting for painting. Waiting for the balance payment. 查看详情
对不起,此内容只适用于美式英文。 查看详情
1.PVC Flexible Air Duct and Axial Flow Fan has been finished. 2.Air Ducts and Axial Fans have been shipped to the port, and it takes about a week to ship. 查看详情
对不起,此内容只适用于美式英文。 查看详情
对不起,此内容只适用于美式英文。 查看详情
1.12th May.2020-South Africa-Fogging Machine-Receive the customer’s bank receipt. 2.Next, we will update the packing and delivery of the goods. 查看详情
Australia -ULV and Mist eliminator 1 1.7th August.2020-Australia-Fogging Machine and ulv-Received customer’s back receipt. 2 2.Products have been tested before leaving the factory, and have been packaged and shipped by air on August 25 查看详情