1.The product—Fog Cannon has finished.
2.Shipment:Scheduled for the 23rd of November, the ship is 10-12 days.
1.The product—Fog Cannon has finished.
2.Shipment:Scheduled for the 23rd of November, the ship is 10-12 days.
1.21th Oct.2019-Receive a deposit-Chad-Low flatbed semi trailer 2.31th Jan.2020-Receipt of payment-Chad-Low flatbed semi trailer 3.Stock up 4.Measure 5.Loading 查看详情
对不起,此内容只适用于美式英文。 查看详情
对不起,此内容只适用于美式英文。 查看详情
1.11th Feb.2020–Received the payment–Peru–Fog Cannon. 2.Production Completed. 3.Shipping and Package Disinfection. 查看详情
Received the payment–Thailand–Industrial Fan. 查看详情