Australia -ULV and Mist eliminator
1 1.7th August.2020-Australia-Fogging Machine and ulv-Received customer’s back receipt.
2 2.Products have been tested before leaving the factory, and have been packaged and shipped by air on August 25
Australia -ULV and Mist eliminator
1 1.7th August.2020-Australia-Fogging Machine and ulv-Received customer’s back receipt.
2 2.Products have been tested before leaving the factory, and have been packaged and shipped by air on August 25
1.PVC Flexible Air Duct and Axial Flow Fan has been finished. 2.Air Ducts and Axial Fans have been shipped to the port, and it takes about a week to ship. read more
1.12th May.2020-Mexico-Fogging Mchine-Receive the customer’s bank receipt. 2.Next, we will update the packing and delivery of the goods. read more
Tämä teksti on valitettavasti saatavilla vain kielillä: Amerikanenglanti ja 中文. read more
Tämä teksti on valitettavasti saatavilla vain kielillä: Amerikanenglanti. read more
Tämä teksti on valitettavasti saatavilla vain kielillä: Amerikanenglanti ja 中文. read more
Tämä teksti on valitettavasti saatavilla vain kielillä: Amerikanenglanti. read more
1.17th June.2020-Peru-Fog Cannon-Received customer’s back receipt. 2.Products have been tested before leaving the factory, and have been packaged and shipped. read more
Tämä teksti on valitettavasti saatavilla vain kielillä: Amerikanenglanti. read more
Tämä teksti on valitettavasti saatavilla vain kielillä: Amerikanenglanti. read more
1.12th May.2020-Peru-30m Spray Cannon-Receive the customer’s bank receipt. 2.The goods are in production. 3.Horizontal centrifugal pump has been scheduled to arrive, wait for the motor to arrive for installation. 4.28th May.2020-Peru-30m Spray Cannon-The product has finished production 5.The goods are packed and ready to ship read more