Related Posts
Order Tracking No.:101019621131-Peru-Impeller
Country: Peru Product name: Impeller 2.The impeller has been produced and tested for dynamic balance, and it was sent out via FedEx last Saturday 3.The goods have been sent to Peru and are undergoing customs clearance. The customer will receive the goods within 3 days read more
Order Tracking No.:SCY20231025-Singapore-Movable axial fan
Transaction 1. The deposit has been received from customer. Production 1. Production of mobile axial flow fan completed. Transportation 1. The fans have been assembled and ready to ship. Transportation 2. Four fans have been packed, labeled, and shipped. read more
Order Tracking No.:SCY20230902-Singapore-Tunnel Fan
Transaction 1. Received 50% deposit from customer. Production 1. The material cutting is complete. 2. The housing assembly is complete. 3. The fan painting is complete. read more
Order Tracking No.:2018090701-Pakistan-Centrifugal Fan Blower
1.Fans for Pakistani customers have been produced and tested on site. Wooden boxes are packed for export at the factory, and the goods have been sent to the port for shipment to Pakistan. read more
Order Tracking No.:vn1267102029wetb–Woodworking Dust Collector
1.Woodworker dust collector has been installed and completed. 2.Fan Blower has also been completed and tested. 3.Contact the freight forwarder and prepare to ship. 4.The woodworking dust collector has been shipped. Below are pictures of packing and shipping. read more
Tracking Order:SCY20230322-India-Cooling Fan
Transaction 1. Received customer’s bank slip Production 1.After confirming drawing, start production for ten sets fans. Have finished cutting material process. 2. This is the goods ten sets of cooling fans after shot blasting. 3. Painting the top... read more
Order Tracking No.:SCY2023010901-1-Vietnam-centrifugal fan
Transaction Country:Vietnam Product:centrifugal fan 1.Customer’s payment bill before production. Production 1. Provide customers with drawings and produce according to the drawings. 2. Impeller in the production process. 3.Housing during production. 4. Base during production. 5.The housing and motor... read more
Order Tracking No.:SCY20220429-Indonesia-Impeller
Transaction Country:Indonesia Product:Impeller 1. Receive 100 percent payments from customer. read more
Order Tracking No.:An2022112501-Austria-Heat Pump
Transaction 1. Customer’s deposit payment bill before production. Production 1. Testing unit operation. Production 2. Ready to ship. Production 3. In shipping warehouse. read more