Country:Thailand
Product:Roots blower
Date:2020-09-16
Received customer’s bank receipt.
Country:Thailand
Product:Roots blower
Date:2020-09-16
Received customer’s bank receipt.
Transaction Country:Israel Product:Air Handling Unit 1. T/T 50% to be paid as deposit. 2. Customer pays 50% of the final payment. Production 1. Assembly of functional segments. 2. Production completed. 3. The installation of the air valve is completed. ... read more
Transaction Country:United Arab Emirates (UAE) Product:Centrifugal Blower 1.50% Deposit payments in advance from customer. Production 1. The casing, impeller, and bracket parts have been finished lofting,marking-off and cutting. 2. The impeller and casing of the centrifugal fan have been assembled and... read more
Transaction Country:Kazakhstan Product:Axial Fan 1. T/T 50% to be paid as deposit. 2. The customer pays the remaining 50% of the payment. Production 1. Production completed. 2. Measuring dimension. 3.Testing unit air volume. Transportation 1. Ready to... read more
Transaction Country Name:Mongolia Product Name:Centrifugal fan 1.Customer’s payment bill before production. Production 1.Provide customers with drawings and produce according to the drawings. 2.The Centrifugal fanare in production 3.The Centrifugal fan are assembled by our workers. 4.Centrifugal fan pictures to customers. read more
1.9th July.2020-Guatemala-Fogging Machine-Received customer’s back receipt. 2.Products have been tested before leaving the factory, and have been packaged and shipped.The cargo ship is scheduled to sail on July 25 3.We expect customers to receive the perfect goods and put them into use read more
Transaction Country: India Product Name: Fog Cannon-DMC-30 1.18th March.2022 Received customer’s bank slip Production 1.The production department has placed orders. 2.Production progress update every 3-5 days. read more
1.The product is finished. 2.The original ship scheduled for October 13 will be postponed to the 19th. Bill of lading number:I240248347S04 Vessel voyage:TIHAMA 011W read more
1.13th May.2020-Ireland-Mist Cannon-Receive the customer’s bank receipt. 2.Next, we will update the packing and delivery of the goods. read more