Related Posts
Order Tracking No.:1527166290-Thailand–Industrial Fan
Received the payment–Thailand–Industrial Fan. read more
Order Tracking No.:SCY20201124-Uzbekistan-Dust collector
1.Receive payment slips from customers. read more
Order Tracking No.:Ca2023081201-Panama-Pipe dredging machine
Transaction 1. T/T 100% to be paid as deposit. Production 1. Assembly of functional segments. 2. Production completed. 3. The achine of testis completed. Transportion 1. Packaging completed. 2. The machine has been shipped. read more
Order Tracking No.:2020050502-South Africa-Fogging Machine
1.13th May.2020-South Africa-Fogging Machine-Receive the customer’s bank receipt. 2.14th May.2020-Production completed. 3.26th May.2020-Ship by sea. read more
Order Tracking No.:MIC20220429-Kazakhstan-Tunnel Mining Ventilation Fan
Transaction Country Name: Kazakhstan Product Name: Tunnel Mining Ventilation Fan Receive the customer’s full payment bill. read more
Order Tracking No.:202101081011-Chile-Fog Cannon Body
1.2th February.2021-Chile-Cannon Body-Received customer’s back receipt. Fog Cannon 2.Products have been tested before leaving the factory, and have been packaged and shipped. mist cannon dust suppression fog cannon packing fog cannon nozzle Transaction-Second Order Country: Chile Product Name: Welding Fume Dust Collector 1.17th June.2021-Received customer’s back receipt. Production 2.Products have been tested before leaving the factory, and will be ready to pack and ship. Transportation 3.Expected to arrive in Chile on 14th August. read more
Order Tracking No.:SCY20210610-Singapore-Air Duct for Tunnel
Transaction Country: Singapore Product Name: Air Duct for Tunnel 1.Customer’s deposit payment bill before production. Production 1.The goods has been finished and ready to ship. Ready to ship to singapore this tommorrow. read more
Order Tracking No.:SCY20211119-Thailand-ID FAN for Wooding Working Boiler
Transaction Country: Thailand Product Name: ID FAN for Wooding Working Boiler 1.Customer’sdeposit payment bill before production. Production 1.Have started cutting raw material. Automatic NC cutting. 2.The fan base has been welded by technicians with many years of welder experience. 3.Housing is been welding. 4.Impeller dynamic test been finished.And qualified. 5.The shedding... read more