Related Posts
Order Tracking No.: Ru2023081501-Tanzania-DX Air Handling Unit
Transaction T/T 50%. 2. T/T Balance 50%. Production 1.Assembly of the Outdoor Unit and Assembly of Connection Unit. . 2.Installation of pressure gauge. 3.Outdoor nameplate installation completed. 4.Indoor nameplate installation completed and DX Air Handling Unit is Being Prepared... read more
Order Tracking No.:Decent 20200812-Arab
1、8.27 Received Payment voucher from Arab customers read more
Order Tracking No.:100660470256-Peru-Axial Fan
Transaction 1. 30% Deposit payments in advance from the customer. Production 1. The fan casing has been completely welded. 2. The fan casing has been completely welded. read more
Order Tracking No.:2020050501-Peru-30m Spray Cannon
1.12th May.2020-Peru-30m Spray Cannon-Receive the customer’s bank receipt. 2.The goods are in production. 3.Horizontal centrifugal pump has been scheduled to arrive, wait for the motor to arrive for installation. 4.28th May.2020-Peru-30m Spray Cannon-The product has finished production 5.The goods are packed and ready to ship read more
Order Tracking No.:Ar20240402-Cambodia-Roots Blower
Transaction 1. T/T 50% as deposit,T/T 50% balance should be paid before shipment from factory. Production 1. The production of the fan has been completed and is being painted. read more
Order Tracking No.:101072843967-Czech Republic-Fog Cannon
Country:Czech Republic Product:Fog Cannon The fog cannon that our Czech customer just ordered, we have notified the Production Department to start production read more
Order Tracking No.:bd106337020-Bangladesh-Roots Blower
1.Received the full amount of Roots blower from Bangladesh customer. 2.Ready to arrange production department production. 3.Bangladesh customer’s roots blower has been finished the production.The following is a detailed picture. 4.The goods have been packed and sent to the port.The following is a detailed picture. read more
Order Tracking No.: Ru2022100901-Afghanistan-Air-cooled chiller
Transaction Country:Afghanistan Product:Air-cooled chiller 1. T/T 30% to be paid as deposit. read more