2019-04-14: Under production.
Related Posts
Order Tracking No.:SCY20220307-Hongkong, China-Centrifugal fan 10-18-8C
Transaction Country: Hongkong Product Name: centrifugal fan 10-18-8C 1.Customer’s payment bill before production. Production 1.Provide customers with drawings and produce according to the drawings. 2.Housing, impeller in the production process. 3.The housing and motor of the fan have been... read more
Order Tracking No.:SCY2021122302-Hong Kong-Centrifugal Fan 4-72-10
Transaction Country: Hongkong, China Product: Centrifugal Fan 4-72-10 Production 1.Customer’sCAD drawing before production. 2.Have started cutting raw material. Automatic NC cutting. 3.Thefan base has been welded by technicians with many years of welder experience. 4. The housingand motor of the fan have been assembled by our workers. 5.The impeller... read more
Order Tracking No.:SCY20220606-Saudi Arabia-DMC-112 Dust Collector
Transaction Country: Saudi Arabia Product: DMC-112 Dust Collector 1.100% payments in advance from the customer. 2. Dust collector body and hopper have all been welded. 3. Color has been painted as per the customer’s requirements. 4. Industrial dust... read more
order-tracking-no-scy2022030101-maldives-sound-attenuator
Transaction Country:Maldives Product:Sound Attenuator 1. Customer’s payment bill before production. 2. Customer’s payment bill after production. Production 1. Provide customers with drawings and produce according to the drawings. 2. The Sound Attenuator are in production. 3. The Sound Attenuator... read more
Order Tracking No.: Ali20230623-Serbia-mining fan
Transaction Country: Serbia Product Name: Mining Fan 1.Customer pays 50% deposit. Production 1.The blanking is completed and the drum welding is completed, fan splicing and assembly were completed. 2. Painting completed. read more
Order Tracking No.: MIC20220718-Mongolia-Axial Fan
Transaction Country:Mongolia Product:Axial Fan 1. 50% Deposit payments in advance from customer. Production 1. The fan casing has been completely welded. 2. The purchased Siemens Bader motor has arrived at the factory. 3. The factory has completed the welding work.... read more
Order Tracking No.:SCY2022043001-Indonesia-Cutting Blower
Transaction 1. 50% Deposit payments in advance from the customer. Production 1. CNC cutting and blanking, more precise. Production 2. Fan has been finished as customer’s requirement, the motor on the top is the installation limited. read more
Order Tracking No.:SCY20210923-Laos-Dust collector
Transaction 1. Received customer’s bank slip. Production 1. Production progress update . 2. Hopper production has been completed. 2. Waiting to install air bag and pulse valve . read more
Order Tracking No.:202006250002-Uganda-Fogging Machine
1.15th July.2020-Uganda-Fogging Machine-Received customer’s back receipt. 2.The product has been tested before leaving the factory and is ready for transportation to Kenya. read more
Order Tracking No.:SCY20220429-Indonesia-Impeller
Transaction Country:Indonesia Product:Impeller 1. Receive 100 percent payments from customer. read more