Received the payment–Thailand–Industrial Fan.
Related Posts
Order Tracking No.:SCY100746230628-Indonesia-Centrifugal fan Heat exchanger Filter bag Filter bag cage Rotary valve Pulse valve Pulse valve controller
Country:Indonesia Product: Centrifugal fan Heat exchanger Filter bag Filter bag cage Rotary valve Pulse valve Pulse valve controller 1.17th Dec.2020 Received customer’s bank slip 2.Production progress update:Centrifugal fan 3.Production progress update:Heat exchanger 4.Production progress update:Filter bag cage 5.Production progress update:Filter bag 6.Production progress update:Rotary valve 7.Production progress update:Pulse valve 8.Production progress update:Pulse valve controller 9.2019-04-14: Cargo is ready and waiting for... read more
Order Tracking No.:El2023102402-Russian-Air cooled chiller
Transaction 1. Receipt from client for full payment. Production 1. Nov. 27:The compressor has arrived at the factory and is being installed. 2. Nov. 30: Two air-cooled chillers were produced and are under pressure. 3. Dec.07:Test image... read more
Order Tracking No.:2020101201-Afghanistan-Air Cooled Chiller
The Air cooled chiller used in the Afghan pharmaceutical factory has been tested online with customers on March 30, 2021, and is currently ready to be shipped to customers. read more
Order Tracking No.: SCY2023031702-1-Thailand-centrifugal fan
Transaction Country:Thailand Product:centrifugal fan 1.Customer is payment bill before production. Production 1. The cutting of the fan has been completed. 2. The molding of the fan has been completed. 3. The external procurement of the fan motor has been... read more
Order Tracking No.:SCY20220606-Saudi Arabia-DMC-112 Dust Collector
Transaction Country: Saudi Arabia Product: DMC-112 Dust Collector 1.100% payments in advance from the customer. 2. Dust collector body and hopper have all been welded. 3. Color has been painted as per the customer’s requirements. 4. Industrial dust... read more
Order Tracking No.:101175736269-Italy-Fog Cannon
Transaction Country:Italy Produce Name:Fog Cannon 1.10th June.2021-Italy-Fog Cannon-Received customer’s back receipt. Production 2.The workshop is waiting to arrange production 3.Products have been tested before leaving the factory, and will be ready to pack and ship. Transportation 4.The goods has been sailed.Expected to arrive in Genoa on... read more
Order Tracking No.:SCY2022090101-Azerbaijan-Centrifugal fan
Transaction Country: Azerbaijan Production: Centrifugal fan 1. Customer’s deposit payment bill before production. Production 1.Impeller production completed and dynamic blance test. read more
Order Tracking No.:Ar2021052001-QATAR-Copper pipe
Transaction 1. Customer payment in full. Production 1. The Copper pipe production is completed. 2. The Copper pipe are counted and weighed online. Transportion 1. Customer payment in full. read more
Order Tracking No.:20200531001-South Africa-Fogging Machine
1.5th Jun.2020-South Africa-Fogging Machine-Received customer’s back receipt. 2.Products have been tested before leaving the factory, and have been packaged and shipped. read more
Order Tracking No.:101043261038-Tunisia-FogCannon
1.20th October.2020-Tunisia-FogCannon-Received customer’s back receipt. 2.Products have been tested before leaving the factory, and have been packaged and shipped. 3. 13th January.2021-Tunisia-Fog Cannon-Received customer’s balance. read more