Order Tracking No.:SCY2024022302-THAILAND-Combustion Air Fan
Transaction 1. T/T50% as deposit,TT50% balance should be paid before shipment from factory.
Transaction 1. T/T50% as deposit,TT50% balance should be paid before shipment from factory.
Transaction 1. T/T 50% as deposit,T/T 50% payment before shipment from factory. Production 1. Theproduction is completed. 2. The dimensions are being measured according to the drawing.
Transaction 1. Customer payment in full. Production 1. The Copper pipe production is completed. 2. The Copper pipe are counted and weighed online. Transportion 1. Customer payment in full.
Sorry, this entry is only available in Russian.
Transaction 1. Customer’sdeposit payment bill before production. Production 1. The housing has been ready for rust removal and then will assembled with the pipes. 2. More pictures sharing.
Transaction 1.Customer’s payment bill before production, full trust. Production 1. Have been finished cutting raw material. 2. Two blowers have all been painted in gray as customers requirement. 3. Professional Testing in the laboratory before delivery. Transportion 1. The goods have been sent to port and ready to ship. Waiting for the vessel.
Transaction 1. FogCannon-Received customer’s back receipt. 2. Fog Cannon-Received customer’s balance. Production 1. Products have been tested before leaving the factory, and have been packaged and shipped.
Transaction 1.Received customer’s back receipt. Production 1.The workshop is waiting to arrange production. 2.Products have been tested before leaving the factory, and will be ready to pack and ship.
Transaction T/T(USD7963.00) as deposit (Paid). Production 1. The production is completed and awaiting assembly. 2. The exhaust Fan and Centrifugal Fan are assembly completed. 3. The exhaust Fan and Centrifugal Fan has been tested. Transportion 1. The explosion-proof dust collector are packed and Send to the designated location. 2. The product has been shipped.