Transaction
Country:Maldives
Product:Sound Attenuator
Country:Maldives
Product:Sound Attenuator
Production
Transportation
Transaction Country:Vietnam Product:centrifugal fan 1.Customer’s payment bill before production. Production 1. Provide customers with drawings and produce according to the drawings. 2. Impeller in the production process. 3.Housing during production. 4. Base during production. 5.The housing and motor... read more
1.5th Jun.2020-South Africa-Fogging Machine-Received customer’s back receipt. 2.Products have been tested before leaving the factory, and have been packaged and shipped. read more
Order date: 2020.11.03 Country: Slovenia Product name: Fluororubber Diaphragm 1.We received the payment from the Slovenian customer 2.The goods have been sorted out and ready for transportation read more
1.12th May.2020-Peru-30m Spray Cannon-Receive the customer’s bank receipt. 2.The goods are in production. 3.Horizontal centrifugal pump has been scheduled to arrive, wait for the motor to arrive for installation. 4.28th May.2020-Peru-30m Spray Cannon-The product has finished production 5.The goods are packed and ready to ship read more
1.On November 14, 2019, Honduran customer purchased a Roots blower and paid 50% deposit by T/T. 2.The Roots Blower has been finished production. 3.Roots Blower has completed preliminary testing and sends test videos and reports to customers. read more
Transaction Country: India Product Name: Fog Cannon-DMC-30 1.18th March.2022 Received customer’s bank slip Production 1.The production department has placed orders. 2.Production progress update every 3-5 days. read more
Country:Indonesia Product: Centrifugal fan Heat exchanger Filter bag Filter bag cage Rotary valve Pulse valve Pulse valve controller 1.17th Dec.2020 Received customer’s bank slip 2.Production progress update:Centrifugal fan 3.Production progress update:Heat exchanger 4.Production progress update:Filter bag cage 5.Production progress update:Filter bag 6.Production progress update:Rotary valve 7.Production progress update:Pulse valve 8.Production progress update:Pulse valve controller 9.2019-04-14: Cargo is ready and waiting for... read more
1.20th October.2020-Tunisia-FogCannon-Received customer’s back receipt. 2.Products have been tested before leaving the factory, and have been packaged and shipped. 3. 13th January.2021-Tunisia-Fog Cannon-Received customer’s balance. read more